Hydroelectric, Instrumentation & Controls, O&M, Renewables, Retrofits & Upgrades

Eaton to upgrade hydroelectric power plant’s electric system

Eaton (NYSE: ETN) is helping to modernize and upgrade an electrical system at a hydroelectric power plant in Vermont.
 
Eaton will update and automate the power and control systems at the 6.9-MW Proctor hydroelectric station owned by Green Mountain Power. The project includes replacing the excitation system, governors, turbines, control system and power distribution equipment.

Subscribe to Power Engineering magazine