Coal, Retrofits & Upgrades

Alstom wins boiler retrofit contract at Brazil’s Presidente Medici power plant

15 September 2009 – Alstom has signed a contract worth approximately EUR30m ($44m) with Companhia de Geracao Termica de Energia Eletrica (CGTEE) for the retrofit of units 3 and 4 of the Presidente Medici III coal fired power plant near Candiota city, Brazil.

15 September 2009 – The Kuwait Ministry of Electricity and Water has signed a turnkey contract with GE and Hyundai Heavy Industries totaling $2.65bn for a 2000 MW combined-cycle power plant in Sabiya.