Coal, Gas

Combustion Turbine Inlet Air Cooling — Check Your Design Point

Issue 5 and Volume 108.

By: John E. Kraft, P.E., Caldwell Energy

Editor’s Note: At POWER-GEN International in Las Vegas this past December, a conference session on combustion turbine power augmentation raised a number of critical questions regarding the economics of inlet air cooling technologies. This article builds on the discussions from that session and attempts to address some of the unresolved issues that arose during the session.

Inlet air cooling systems have been installed on thousands of combustion turbines to recover power lost due to high ambient temperatures. There are various combustion turbine inlet air cooling (CTIAC) technologies available, and companies typically market these products based on their cost and performance at a particular design point, expressed in dollars per kilowatt. Using such a basis can be misleading, however, because design conditions may occur for only a fraction of the system’s operating time. A better approach is to calculate the energy increment (kWh) available during a given time period and the associated increased capacity of the plant. This could be further sub-divided into on-peak and off-peak increments.

Technology Options

There are three main technological options for inlet air cooling: fog/evaporative cooling, chilling, and wet compression. Although all three enhance the turbine capacity at high ambient conditions, some are heavily dependent on the ambient conditions. For instance, in humid conditions, a fog/evap cooling system will offer little or no benefit. At those same high humid conditions, a chilling system’s benefit is significantly reduced, due to the added moisture that must be condensed. Conversely, wet compression is not significantly impacted by ambient conditions.

  • Fog/Evap Cooling: Inlet air is cooled by either passing the air through a wetted media, or spraying fine water droplets into the inlet air stream. As the water evaporates, it adiabatically cools the air due to the latent heat of vaporization required. The ambient wet bulb temperature limits this type of cooling and these systems are not typically run if the difference between dry bulb and wet bulb temperature is less than 4 F.
  • Chilling: Inlet air is cooled by a chilled fluid circulating through cooling coils placed inside the ductwork. Typically, mechanical chillers are utilized to provide cooling to the heat transfer fluid circulating through the coils. Absorption chillers may also be used, but are not as effective for cyclic duty or part-load conditions. Thermal energy storage systems are sometimes utilized to optimize output during peak hours only, by shifting a large portion of the auxiliary load requirements to off-peak periods. These systems cool the air to below wet bulb temperature to a pre-selected set point, typically in the 45-55 F range.
  • Wet Compression (also referred to as “high-fogging” and “overspray”): Wet compression is often classified as an inlet air cooling technology, since it recovers lost power during high ambient conditions, but it works equally well during moderate ambient conditions. Wet compression is a patented technology, installed in the CT inlet that acts as a compressor inter-cooler. These systems inject finely atomized water into the compressor of the CT. As the air is heated due to the work of compression, the water evaporates, cooling the compressor air between stages. This results in a more efficient compressor, thus making the entire CT cycle more efficient. Wet compression can be installed in addition to fog/evap cooling or chilling systems to further increase the power output and efficiency of a power plant.

Both evap media and chilling systems permanently increase the airside pressure drop of the inlet systems, even when these systems are not operational. Fogging systems and wet compression systems have no measurable increase in pressure drop.

System Design Point

The design of a CTIAC system is based on a defined design ambient condition. This is typically the worst-case ambient condition that may occur in a given year. The American Society of Heating, Refrigeration and Air-Conditioning Engineers has developed standard tables of design points for various locations throughout the world. These design points are based on historical weather data and are grouped into bands where the average data are reported to exceed the reference conditions 0.4%, 1% or 2% of the time in any given year. As an example, a location with a 0.4% design temperature of 90 F will exceed this temperature for an average of 0.4%, or 35 hours, per year. A design on this basis requires that the capital cost be based on a small percentage of the actual operating hours of the plant.

Click here to enlarge image

If a system is optimally designed for conditions that occur only 35 hours per year, what are the system economics for the remaining 8,725 hours? To answer this question, consider three design days: a hot day, a cool day and a humid day. The “value” of the system’s capital cost and the return on investment will be illustrated for each system, as a result of the added power generated by each. The ambient conditions for each design day are listed in Table 1.

Power generators think of capital costs in terms of dollars per kW of power generation ($/kW). To apply this same philosophy to CTIAC power augmentation systems is misleading, as most CTIAC systems are highly ambient dependent and have significant swings in instantaneous $/kW. A lower $/kW may not have better performance or yield a better rate of return for the capital outlay. Therefore, the average $/kW for any given 24-hour day is a much better indicator of the true cost for a system, as illustrated by the following example.

Click here to enlarge image

The “design point” of any CTIAC system may occur for only a brief period of time each year, and in actuality, may never occur. Considering this, the capital costs ($/kW) are calculated on an hourly basis and then averaged over the entire day that a system is used. In doing this, for a hot day, the wet compression average cost is $63/kW, fog/evap cooling is $98/kW and chilling is $210/kW, as depicted in the first set of bar charts in Figure 1. The significant difference is due to the varying spread between dry and wet bulb temperature throughout the day and the fact that fog/evap cooling and chilling system performance are significantly dependent on ambient fluctuations.

Click here to enlarge image

The energy gains (MWh) for the same 24-hour hot day are depicted in Figure 2; 854 MWh for wet compression, 235 MWh for fog/evap cooling, and 301 MWh for chilling. This represents the increase in “saleable” energy as a result of the various systems operating for a 24-hour period. Figures 1 and 2 also illustrate the average cost and MWh gains for the cool day and humid day.

Return on Investment

Evaluating the return on investment for the various technologies requires an in-depth analysis of the costs and profitability for the particular power plant. For purposes of this analysis, the following assumptions are made: 1) The number of days in a given year that the systems are run during hot, cool and humid days are 60, 30 and 60, respectively; 2) The profit from sales of energy for the power generator is $0.03/kWh. These assumptions can be varied, but for comparison purposes should be representative of the relative difference in each CTIAC power augmentation technology. Table 2 illustrates the energy gains and the return on investment for the three technologies.

Click here to enlarge image

Fog/evap cooling systems are relatively inexpensive and realize significant power gains during the heat of the day. These systems appear very inexpensive at the hot day design point, but are highly ambient dependent and offer little benefit in the mornings, evenings or on humid days.

Chilling systems are a significant capital expense and require significant labor and auxiliary power to run the equipment. The benefit is ambient dependent, where the CT power gains are determined by the difference in the ambient dry bulb temperature and the inlet chilling system design capability. System auxiliary loads and initial sizing are based on the system cooling the inlet air to below the wet bulb temperature.

Wet compression systems offer more consistent power gains throughout the day. These systems are not as ambient dependent, as they actually intercool the compressor, increasing its efficiency. At one plant, for example, the installed wet compression system ran for more than 6,000 hours in one year, with an average gain of 15 MW per hour, representing an annual energy increase of 90,000 MWh. Assuming a conservative profit of $0.02/kWh, the actual return on investment for this system is 150%.

Summary

Careful consideration should be given in picking a “design point” for CTIAC systems, as this will greatly affect system cost, performance and impact feasibility. Daily variances in ambient conditions greatly influence a system’s return on investment, particularly those that are highly ambient dependent – fog/evap cooling and chilling. Qualified and experienced personnel should perform careful analysis in order to accurately evaluate which technology, or combination thereof, is best suited for a particular installation.

Author –

John Kraft, PE, is the President and a founder of Caldwell Energy Company, Louisville, Ky., a provider of combustion turbine inlet air cooling systems, including fogging, chilling, thermal energy storage and wet compression technology. Prior to Caldwell, Kraft was an advanced combustion turbine design engineer for Allison Gas Turbine, working on the ATF engine program. He is a graduate of Purdue University and a registered Professional Engineer in Indiana and Wisconsin.