Uncategorized

Corrections: In the January, 1995, issue of Power Engineering, the OOn the CoverO attribution

Issue 3 and Volume 99.

Corrections: In the January, 1995, issue of Power Engineering, the OOn the CoverO attribution misspelled the location of the company that provided the cover photograph. The ABB Raymond Ehrsam Operations facility is located in Abilene, Kan.

On page 42 in the OField NotesO section of Power Engineering, January, 1995, the item OPolyurethane pipe lining saves $192,000 at Smith Mountain,O contained two errors. The story was published without attributing its source, American Electric Power Service Corp.?s publication Operating Ideas, July/August 1994, and the author?s name, Jennifer L. Smith, was misspelled.

And to all the very astute and comically-adept readers who pointed out that the wind speed figure for Hurricane Andrew could not possibly be 1,420 miles per hour (OField Notes,O page 48, Power Engineering, January, 1995), thank you for pointing that out. The correct figure is 145 miles per hour.