Combined Cycle Power

Home>Topics>Combined Cycle Power
Refine Results
  1. All
  2. Conference Sessions
  3. Online Articles
  4. Magazine Articles
  5. Videos
  6. Magazine Articles
  7. Exhibitor Listings
  1. Combined Cycle Power Plants

    The main activity of Duro Felguera Energía is the execution of turnkey projects for electric power stations with gas turbines (single cycle or combined cycle), both as main contractor or in a consortium with Original Equipment Manufacturers. In this area of activity Duro Felguera Energía has installed 39 plants in various countries of Europe and Latin America, between 50 and more than 1000MW, with a total installed generating capacity of over 12500 MW, and has other 5 plants under construction which will add more than 3000MW to this figure. Duro Felguera Energía is capable to respond to customer requirements for combined cycle power plants in a wide range of configurations and generating capacities. The Asturian company became a pioneer in Spain as regards the construction of this kind of gas-fired power generation plants since it executed at the beginning the 90s a power plant in Barranquilla. (Colombia). This unit carries out the complete project process, including project management, engineering, procurement, construction, erection and commissioning of the power stations. During these last years, it has had the support of the major Original Equipment Manufacturers in the field of power generation with gas turbines, and has participated in a variety of projects with General Electric, Alstom Power, Siemens Westinghouse, Mitsubishi Heavy Industries and Pratt & Whitney. Duro Felguera Energía is currently executing as sole contractor the combined cycle project of Termocentro (1040 MW) in Venezuela for Electricidad de Caracas (EDC), one of the largest ones awarded so far. Besides it, other ongoing projects within this category include combined cycle projects as the EDP Soto de Ribera 5 in consortium with Alstom (400MW), ENDESA Besós 5 (800MW) and Gas Natural Puerto de Barcelona (800MW) in consortium with GE, and ENDESA Ca’s Tresorer II (225 MW) performed by Duro Felguera Energía as sole contractor, all of them in Spain. Main recent simple and combined cycle projects already in operation are: TERMOELÉCTRICA MANUEL BELGRANO (Argentina), 800MW combined cycle power plant, 2x1 multishaft Siemens SGT5-4000F, started in 2006 and completed in 2009, performed in consortium with Siemens. SOUTHERN CROSS Tierra Amarilla (Chile), 160MW simple cycle, turbine Siemens SGT5-2000E, started in 2007 and completed in 2009, performed by Duro Felguera as main contractor. PETROBRAS Genelba Plus (Argentina), 160MW simple cycle, turbine Siemens SGT5-2000E, started in 2007 and completed in 2009, performed by Duro Felguera as main contractor. ENDESA As Pontes (Spain), 800MW combined cycle power plant, 2x1 multishaft GE 109FB, started in 2004 and completed in 2008, performed in consortium with GE. ENDESA Ca’s Tresorer I (Spain), 225MW combined cycle power plant 2x1 multishaft GE 6FA, started in 2004 and completed in 2007, performed by Duro Felguera as sole contractor. ENDESA Barranco de Tirajana II (Spain), 225MW combined cycle power plant 2x1 multishaft GE 6FA, started in 2004 and completed in 2008, performed by Duro Felguera as sole contractor. HIDROCANTÁBRICO Soto de Ribera 4 (Spain), 400MW combined cycle power plant, single shaft Alstom KA26, started in 2006 and completed in 2008, performed in consortium with Alstom.  HIDROCANTÁBRICO Castejón 2 (Spain), 400MW combined cycle power plant, single shaft Alstom KA26, started in 2005 and completed in 2008, performed in consortium with Alstom.

    Blogs

    Blogs

    Mon, 8 Apr 2013

  2. Turn-Key Plants / Combined Cycle Power Plants

    Turn-Key Plants / Combined Cycle Power Plants

    Blogs

    Blogs

    Mon, 9 Apr 2012

  3. Siemens signs service contract for Russian combined cycle power plant

    Siemens and Open Joint Stock Company Fortum have signed a six-year service contract for Fortum’s Nyaganskaya GRES combined cycle power plant in Nyagan, Russia.

    Online Articles

    Online Articles

    Tue, 21 Jan 2014

  4. Combined Cycle Power Plants with Maximum Efficiency and Minimum CO2 Emissions

    Combined Cycle Power Plants with Maximum Efficiency and Minimum CO2 Emissions

    Blogs

    Blogs

    Mon, 8 Apr 2013

  1. GE, Toshiba to work together on combined cycle power plants

    Blogs

    Blogs

    Thu, 24 Jan 2013

  2. CH2M Hill joint venture to build combined -cycle power plant in Australia

    UGL Limited announced that in a 50-50 joint venture with CH2M HILL it has been awarded a $550 million contract by JKC Australia LNG Pty Ltd for the construction of a combined - cycle power plant for the Ichthys liquefied natural gas (LNG) project in Australia.

    Online Articles

    Online Articles

    Mon, 30 Apr 2012

  3. High Efficient and low-CO2 Combined Cycle Power Plant

    High Efficient and low-CO2 Combined Cycle Power Plant

    Blogs

    Blogs

    Sun, 24 Mar 2013

  4. PGE natural gas-fired power plant to use Mitsubishi combined cycle power train

    Mitsubishi Power Systems Americas Inc. announced it will be supplying a natural gas-powered combined - cycle power train to the Carty Generating Station, a new gas turbine combined - cycle power plant being built for Portland General Electric near Boardman, Ore.

    Online Articles

    Online Articles

    Wed, 5 Jun 2013

  5. Siemens develops CO2 capture technology for combined -cycle power plants

    Siemens Energy is to adapt its proprietary process for carbon dioxide capture to the special conditions prevalent in and mode of operation of combined - cycle power plants for the Norwegian utility Statkraft.

    Online Articles

    Online Articles

    Mon, 23 Mar 2009

  6. Entergy to purchase two combined -cycle power plants

    Units of Entergy Corp. signed asset purchase agreements to acquire the 450 MW Hinds Energy Facility and the 620 MW Hot Spring Energy combined - cycle power plants.

    Online Articles

    Online Articles

    Fri, 29 Apr 2011

  7. Combined cycle power plant in Hays County, Texas, starts commercial operation

    A combined - cycle power plant in Hays County, Texas, has started up commercial operation.

    Online Articles

    Online Articles

    Wed, 24 Apr 2002

  8. ALSTOM awarded contract to supply steam turbine for new combined -cycle power plant in Northern Ireland

    ALSTOM has been awarded a contract by VA Tech Hydro GmbH of Vienna, Austria, for delivery of a 3-casing 150 MW steam turbine of the STF20 type for the new Coolkeeragh Combined - Cycle Power Plant in Northern Ireland.

    Online Articles

    Online Articles

    Wed, 18 Dec 2002

Get More Results

CONNECT WITH US