Power Engineering

Table of Contents

08/01/2003
Volume 107, Issue 8
pe1078_cover
  • Opinion

  • News Update

    • In-Shop Turbine/Generator Repair Can Afford Advantages Over Field Fixes
      Among maintenance outage quandaries power plant operators face is whether to send components off site for repair or have the work done on site.
    • The Wind Blows Across the Coal Fields
      Wind power developers bemoan the fact that abundant wind usually exists in regions remote from load centers, where there is rarely adequate transmission to connect wind-generated electricity to population centers.
    • Independent Power Group Urges Caution on Natural Gas Issue
      The Electric Power Supply Association (EPSA) has sent a letter to Secretary of Energy Spencer Abraham recommending against strict federal policies regarding fuel choices for power plants in the U.S.
    • New Reactor Design Achieves Milestone
      Westinghouse Electric Co. President and CEO Steve Tritch says the Nuclear Regulatory Commission's issuance of a draft safety evaluation report (DSER) for the company's AP1000 nuclear power technology is a major milestone that will further encourage new nuclear power plant construction in the U.S.
    • Mergers & Acquisitions
      American Securities Capital Partners and Private Power LLC have agreed to acquire six operating subsidiaries of Primary Energy, Inc. a subsidiary of NiSource.
    • Construction and Contracts
      Construction and Contracts Vogt Power has selected Power Maintenance Resources (PMRI) to provide field supervision, labor, tools and equipment for the removal and re-tube of the heat recovery steam generators for six GE combustion turbines at Portland General Electric's Beaver Generating Station near Clatskanie, Oregon.
    • Personnel and Promotions
      Kam Tejwani has been named president and CEO of Environmental Power Corporation.
    • Business Briefs
      Wisconsin Energy Corp. subsidiary We Power has broken ground on the $640 million Port Washington Generating Station, part of the company's Power the Future plan. We Generation will operate the 1,000 MW gas-fired facility that will replace the plant that currently sits on the site.
  • Features

  • DG Update

    • Fuel Cells Power DoD Facilities
      In 2002, the Watervliet Arsenal in upstate New York served as the host site for ten 5 kW Plug Power fuel cell power systems providing electricity to power a telecommunications facility, a research and development laboratory and base housing.
  • Field Notes

  • Departments

    • Managing the Plant

      • Mount Pleasant Utilities
        For years, the city of Mount Pleasant, in southeast Iowa, has had an interruptible power purchase agreement with its wholesale power supplier, buying power at wholesale rates and re-selling it at retail rates to its customers.
  • Humor

    • Flying Canaries Reader's Challenge
      Editor's Note: The "Flying Canaries" joke printed in the April issue of Power Engineering included a Reader's Challenge, asking readers to explain whether or not a bunch of canaries flying in an enclosed truck will reduce the load on the truck.
Recommend this article Recommend this article () You recommended this article You recommended this article ()
Follow Power Engineering on Twitter

Latest News

Shutterstock coal production trucks

Weekly Coal Production

The Weekly Coal Production shows how much coal is being produced across the U.S.

Federal Reserve Bank of Dallas Weekly Economic Indicators financial business

The Federal Reserve Bank of Dallas' Economic Indicators

The Federal Reserve Bank of Dallas offers a glimpse into how the markets are doing domestical...

Kvaerner awarded contract for gas-fired power plant in Delaware

Kvaerner North American Construction Inc. and its joint venture partner, Parsons Brinckerhoff...

Canadian Solar purchases two solar projects

Canadian Solar Inc. has acquired a majority interest in two utility-scale solar power project...

Operators Restart Unit 2 at PPL Susquehanna

Unit 2 at the PPL Susquehanna nuclear power plant near Berwick, Pa. resumed generating electr...

Settlement agreement limits cost recovery at Edwardsport

The Indiana Utility Regulatory Commission (IURC) on Dec. 27 modified and approved a settlemen...

Toshiba in talks to sell portion of Westinghouse nuclear unit

Toshiba Corp is in talks  to sell up to 16% of its stake in the Westinghouse Electric Co...

Utah nixes nuclear waste storage facility

Plans to park radioactive waste at a storage facility in Utah have been officially called off.

Current Magazine Issue

04/01/2013
Volume 117, Issue 4
1304pe-cover

Watch POWER-GEN 2012

Power Engineering

Article Archives for Power Engineering Magazine

Archived Articles

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013

Continuing Education

Professional Development Hours

To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.