Biomass power plant to be built in Canada

Pratt and Whitney Power Systems said it has been awarded a contract to deliver a 13 MW biomass heat recovery power plant for West Fraser Timber Co. in British Columbia, Canada.

The plant will power to the company's Chetwynd Forest Industries plant utilizing two Turboden 65 HRS Organic Rankine Cycle (ORC) turbogenerators. The Turboden 65 HRS systems will be delivered to West Fraser by the end of 2013, with installation and commissioning expected in 2014. Commercial operation is planned by the second quarter of 2014.

West Fraser is a wood products company with operations in western Canada and the southern United States, producing softwood lumber, MDF, plywood, pulp, newsprint, laminated veneer lumber and wood chips. West Fraser was selected by BC Hydro under the BC Hydro Bioenergy Phase II Call for Power program for two of their sites totaling 180 GWh per year from wood biomass. Through this program, BC Hydro awarded 20-year electricity purchase agreements to West Fraser.

Turboden is a Pratt and Whitney Power Systems company, and Pratt and Whitney is a United Technologies Corp. (NYSE: UTX) company.

Read more biomass energy news

Sponsored by FLSmidth

Related Articles

 Governors looking to expand renewable energy, natural gas

Governors looking to expand renewable energy, natural gas

The governors of Massachusetts, Connecticut and Rhode Island are joining forces to look for ways to increase the region's reliance on renewable energy sources while also expanding natural gas capacity.

 DCO Energy to provide EPC services for biomass renewable energy plant

DCO Energy to provide EPC services for biomass renewable energy plant

DCO Energy will provide engineering, procurement and construction (EPC) services for, and hold an ownership stake in, a new biomass facility.



Follow Power Engineering on Twitter

Latest News

 MS Power coal-to-gas conversion nearly complete

MS Power coal-to-gas conversion nearly complete

A coal-to-gas conversion project at a power plant operated by Mississippi Power is nearly com...
 North Anna nuclear power plant shuts down

North Anna nuclear power plant shuts down

Unit 1 of the North Anna nuclear power plant automatically tripped offline Feb. 26 as workers...
 Oklahoma leaders looking for more wind regulations

Oklahoma leaders looking for more wind regulations

With wind energy production in full swing in Oklahoma, legislative leaders are looking to imp...

Second-oldest nuclear reactor in S. Korea OK to restart

South Korea’s nuclear watchdog approved a plan to restart a 679-MW nuclear power unit that wa...
 SunEdison to bring power to 20Mn people by 2020

Video: SunEdison to bring power to 20Mn people by 2020

SunEdison, Inc. (NYSE: SUNE) announced plans to bring electricity to 20 million people in und...
02-25 Henry Hub Average Natural Gas Spot Prices

02/25 Henry Hub Average Natural Gas Spot Prices

The Henry Hub is the pricing point for natural gas futures contracts traded on the New York M...
 GDF Suez wants Areva to deliver nuclear reactors, wind turbines

GDF Suez wants Areva to deliver nuclear reactors, wind turbines

GDF Suez says it received guarantees from Areva for planned nuclear reactors in Turkey and wi...
 CB&I: We’re not liable for $247mn nuclear power project penalties

CB&I: We’re not liable for $247mn nuclear power project penalties

Chicago Bridge & Iron (CB&I, NYSE: CBI) say they should not be liable for any of the ...

Power Engineering Current Issue

02/01/2015
Volume 119, Issue 2
1502PE-cover

Products Showcase

Dynamic Fluoride Ion cleaning DFIC of industrial natural gas turbines Hi-Tech Furnace Systems

Dynamic Fluoride Ion Cleaning of IGT Parts

The Dynamic Fluoride Ion Cleaning (DFIC) Process from Hi-Tech Furnace Systems is able to clean deep, narrow cracks of oxides by cycling between negative, atmospheric, and positive pressure.

Archived Articles

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013 | 2014 | 2015

Power Industry Wire News

Intergraph(R) CADWorx & Analysis University Express in India During March to Include Sessions on Designing Plants and Offshore Facilities

Intergraph(R) CADWorx & Analysis University Express in India During March to Include Se...

What's Coming to the Energy Sector in 2015?

What's Coming to the Energy Sector in 2015?

SL Series Is Tinius Olsen's New Generation of Hydraulic Universal Testing Machines

SL Series Is Tinius Olsen's New Generation of Hydraulic Universal Testing Machines

Manitok Energy Inc.'s CEO Mass Geremia Interviewed by The Energy Report

Manitok Energy Inc.'s CEO Mass Geremia Interviewed by The Energy Report

UGE International Ltd. Announces Private Placement

UGE International Ltd. Announces Private Placement

Power Engineering

Article Archives for Power Engineering Magazine

Continuing Education

Professional Development Hours

To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

Latest Energy Jobs

View more Job Listings >>