Russian power lines project for exports to China valued at $6bn

22 March 2007 - The Russian Federal Grid Company (FSK) has valued the construction of electric power lines under a project to export Russian electricity to China at some $6bn.

"The construction is estimated at $6bn," member of the FSK executive board and capital construction director Alexei Maslov.

"If the project is launched its budget will be reflected in the price at which China will buy electricity," he said. "If this [electricity supply] is economically expedient - judging from an estimate - spending on the grids will be reflected in the proceeds," he said.

The FSK, which will manage the construction and operation of the power lines, will be able to draw outside funding, or get resources directly from the operator of the project, which is a party to the contract with China, Maslov said. But the project is still in the making, and estimates of the investment required at each stage of the project have not been completed, said Maslov.

Sponsored by FLSmidth

Related Articles

EPA releases coal ash rule

The U.S. Environmental Protection Agency (EPA) Administrator Gina McCarthy announced the agency will now consider coal ash on the same level as household waste as opposed to hazardous waste. Household garbage and coal ash are both listed in the solid waste category, a stretch from the hazardous waste classification.

Fuel Tech receives air pollution control contracts worth $3.6Mn

Fuel Tech Inc. has received multiple air pollution control (APC) contracts, worth approximately $3.6 million, from customers in China, Europe and the U.S.

Follow Power Engineering on Twitter

Latest News

W.Va. gov signs bill letting lawmakers OK state carbon plan

Democratic Gov. Earl Ray Tomblin has signed a bill letting lawmakers approve state plans to m...
 Nuclear company Areva in turmoil after billions in losses

Nuclear company Areva in turmoil after billions in losses

Nuclear manufacturer Areva has announced a 4.8 billion euro loss for 2014, more than its enti...
 Electric utility Dominion flexes political muscles in Virginia

Electric utility Dominion flexes political muscles in Virginia

Virginia's 2015 legislative session was a good one for energy giant Dominion Resources Inc. (...
Callaway Energy Center's Replacement Reactor Vessel Closure Head Project

[Image Gallery] Callaway Energy Center Nuclear Power Upgrade Project

 DOE to help tribes advance onsite, renewable energy projects

DOE to help tribes advance onsite, renewable energy projects

DOE announced the third round of START Renewable Energy Project Development Assistance, which...
Report: 2014 was the best year for utility-scale solar power

Report: 2014 was the best year for utility-scale solar power

With more than 3.7 GW installed, 2014 was the best year yet for utility-scale solar power ins...
CHP: Energy Independence Offers a Competitive Edge

[Image Gallery]

Best Boiler Cleaning Practices

[Image Gallery]

Power Engineering Current Issue

03/01/2014
Volume 118, Issue 3
1403PE-cover

Products Showcase

Dynamic Fluoride Ion cleaning DFIC of industrial natural gas turbines Hi-Tech Furnace Systems

Dynamic Fluoride Ion Cleaning of IGT Parts

The Dynamic Fluoride Ion Cleaning (DFIC) Process from Hi-Tech Furnace Systems is able to clean deep, narrow cracks of oxides by cycling between negative, atmospheric, and positive pressure.

Archived Articles

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013

Power Industry Wire News

Viking Provides Update on Status of First Well Within the Joffre, Alberta, Canada Project

Viking Provides Update on Status of First Well Within the Joffre, Alberta, Canada Project

Paula Reynolds Joins Siluria Technologies Board of Directors

Paula Reynolds Joins Siluria Technologies Board of Directors

Cummins Announces Two New Nominees for its Board of Directors

Cummins Announces Two New Nominees for its Board of Directors

Scorpio Bulkers Inc. Announces Financial Results for the Fourth Quarter of 2014

Scorpio Bulkers Inc. Announces Financial Results for the Fourth Quarter of 2014

Powerdyne Enters Into Final Negotiations for Its First Commercial Install

Powerdyne Enters Into Final Negotiations for Its First Commercial Install

Power Engineering

Article Archives for Power Engineering Magazine

Continuing Education

Professional Development Hours

To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

Latest Energy Jobs

View more Job Listings >>