DTE Energy Technologies Signs Agreement to Develop and Market High-Efficiency Electric Mini-Turbine

FARMINGTON HILLS, Mich.—DTE Energy Technologies, an unregulated subsidiary of DTE Energy Co., has signed agreements with Pratt & Whitney Canada Corp. and The Turbo Genset Co. Ltd., of the United Kingdom, for the development of a 400 kW turbine generator. These agreements are founded upon the Memorandum of Understanding for development of the mini turbo-generator system, which was announced March 13, 2000.

This new high-efficiency product, the energy|now turbine-generator, model ENT 4000, is targeted for distributed generation applications for small- to medium-sized commercial customers and micro-grids serving both residential and commercial development projects. Distributed generation involves small, onsite electricity generation sources.

The companies now are proceeding with the design and integration of specially designed and manufactured turbine engines from Pratt & Whitney Canada and high-speed electric generators and associated power electronics from Turbo Genset. DTE Energy Technologies will provide overall system controls for integration into micro-grids and remote monitoring, as well as interfaces to traditional utility grids. DTE Energy Technologies also will be responsible for the packaging of the systems and marketing of the ENT 4000. DTE Energy Technologies will market the units.

"The energy|now turbine-generator is a major step forward by DTE Energy Technologies to provide the commercial and electric utility marketplace with distributed generation choices that can serve a variety of electric and economic needs," said Paul Horst, DTE Energy Technologies president.

The energy|now turbine-generator will utilize Pratt & Whitney's state-of-the-art industrial engine, much like a helicopter engine, as the core of the package. These engines will directly drive high-speed generator systems from Turbo Genset, which employ a unique technology that allows high performance and reliability at one-tenth of the size and weight of conventional generators in this power range. Commercial units are expected to be available beginning in early 2002.

Sponsored by FLSmidth

Related Articles

Electricity fully restored in Detroit after outage

Detroit officials fully restored power to downtown government buildings, schools, a hospital, traffic lights and police and fire halls Tuesday after a major cable failure caused parts of the city to go dark for up to seven hours.

DTE Energy to purchase 732 MW natural gas generation facility for $240M

DTE Energy (NYSE: DTE) announced plans to purchase the 732-MW Renaissance Power Plant, a simple-cycle natural gas facility, for $240 million.

Follow Power Engineering on Twitter

Latest News

Shutterstock coal production trucks

Weekly Coal Production

The Weekly Coal Production shows how much coal is being produced across the U.S.

Federal Reserve Bank of Dallas Weekly Economic Indicators financial business

The Federal Reserve Bank of Dallas' Economic Indicators

The Federal Reserve Bank of Dallas offers a glimpse into how the markets are doing domestical...

Kvaerner awarded contract for gas-fired power plant in Delaware

Kvaerner North American Construction Inc. and its joint venture partner, Parsons Brinckerhoff...

Canadian Solar purchases two solar projects

Canadian Solar Inc. has acquired a majority interest in two utility-scale solar power project...

Operators Restart Unit 2 at PPL Susquehanna

Unit 2 at the PPL Susquehanna nuclear power plant near Berwick, Pa. resumed generating electr...

Settlement agreement limits cost recovery at Edwardsport

The Indiana Utility Regulatory Commission (IURC) on Dec. 27 modified and approved a settlemen...

Toshiba in talks to sell portion of Westinghouse nuclear unit

Toshiba Corp is in talks  to sell up to 16% of its stake in the Westinghouse Electric Co...

Utah nixes nuclear waste storage facility

Plans to park radioactive waste at a storage facility in Utah have been officially called off.

Power Engineering Current Issue

03/01/2014
Volume 118, Issue 3
1403PE-cover

Products Showcase

Dynamic Fluoride Ion cleaning DFIC of industrial natural gas turbines Hi-Tech Furnace Systems

Dynamic Fluoride Ion Cleaning of IGT Parts

The Dynamic Fluoride Ion Cleaning (DFIC) Process from Hi-Tech Furnace Systems is able to clean deep, narrow cracks of oxides by cycling between negative, atmospheric, and positive pressure.

Archived Articles

2000 | 2001 | 2002 | 2003 | 2004 | 2005 | 2006 | 2007 | 2008 | 2009 | 2010 | 2011 | 2012 | 2013

Power Industry Wire News

Perma-Fix Environmental Services Appoints Larry M. Shelton Chairman of the Board

Perma-Fix Environmental Services Appoints Larry M. Shelton Chairman of the Board

Scorpio Bulkers Inc. Announces Agreement to Sell Kamsarmax Newbuilding

Scorpio Bulkers Inc. Announces Agreement to Sell Kamsarmax Newbuilding

Next Generation ZaZZZ Proprietary and Identity-Verifying Vending Machines Ship to 18 Locations This Month

Next Generation ZaZZZ Proprietary and Identity-Verifying Vending Machines Ship to 18 Lo...

Rockdale Resources Enhances Operations, Implements Cost Reductions and Changes Board Composition

Rockdale Resources Enhances Operations, Implements Cost Reductions and Changes Board Co...

Cardinal Energy Group, Inc.: Bradford Lease Drilling Report

Cardinal Energy Group, Inc.: Bradford Lease Drilling Report

Power Engineering

Article Archives for Power Engineering Magazine

Continuing Education

Professional Development Hours

To access a course listing associated to a specific topic listed below, click on the topic of choice from the list below.

Latest Energy Jobs

View more Job Listings >>